Manufacturing Facilities

Wealmore Atherstone

Client:

Wealmore

Contractor:

Bowmer & Kirkland

M&E Value:

£4.6 Million

Completion Date:

September 2009

About The Project:

Wealmore has become a market leader in the packing and wholesaling of fresh produce and supplies all of the major UK supermarkets.

 

Following a fire in 2007 the factory was completely destroyed calling for a new factory to be built in its place. Within the one factory, there are two buildings. One where the fruit and vegetables are delivered, washed and stored and the second where the products are processed and packaged before they are despatched for sale.

 

There are also a number of offices and changing rooms.

Mechanical Scope:

  • Incoming services
  • Hot and cold water installation
  • Ventilation
  • Automatic natural ventilation
  • Main kitchen supply and extract ventilation
  • Sanitaryware and above ground drainage
  • Compressed air
  • Wash-down points
  • Rainwater harvesting
  • Sprinkler system
  • Building Management Systems

Electrical Scope:

  • Incoming services
  • Mains distribution
  • Earthing and bonding
  • Internal, external and emergency lighting
  • General power and small power
  • Lightning protection
  • Fire detection and alarm system
  • Disabled refuge alarms and disabled WC alarms
  • Security systems
  • Access control and intercom system
  • TV and audio system
  • Mechanical services wiring
  • Structured cabling installation
  • Controls
  • Specialist stage lighting
  • Induction loop system
  • UPS system
  • Photo voltaic
  • Turnstiles